BURWELL — A $4.8 million construction project is set to begin on Nebraska-11, north of Burwell this week.
The work runs from the Highway 11-91 intersection and continues north for 11 miles.
The project includes grading and erosion control, drainage structure installation, bridge repair, milling and asphalt paving on the roadway. and resurfacing of driveways and intersections.
Single-lane trafic will be maintained with traffic control devices, flaggers and a pilot vehicle. The hope si to be finished by late September.